BD65 crusher special backing adhesives,crusher lining plate wear resistant filling material

The product picture of our BD65 crusher special backing adhesive,crusher liner plate special adhesives for your reference:

BD65 crusher backing adhesive

product usage:
BD65 backing adhesives(crusher lining plate filling adhesive) is used in the filling/supporting between crusher lining plate and substrates,gravel barrels and jacket gap,support cone and protective layer space,at the same time it can be used as buffer material,when the equipment suffers impacting or load vibration from broken ore, also used in the structural reinforcement,impact resistant vibration of ball mill wear resistant lining plate and cylinder gap.

performance features:
☆  Before curing:with good fluidity and strong filling ability,easy to operate,safety and environmental protection
☆  After curing:with low shrinking percentage and good adhesion,bearing capacity is high,can tear down

BD65 backing adhesive use technology
1  Cleaning up and preparation:    Clean up the residual filling material of the cone surface,or greasy dirt and dirt from the parts where touch with adhesive.Fit up the cone and lining plate,seal up the cone/lining plate fitting surface and ring hole with adhesive tape etc,to avoid leaking adhesive,in necessity,protect the screw thread on the axis,construction is in the temperature of 5℃-30℃ as far as possible during using.General construction in winter,you had better heat the A component up to the temperature of 25℃-35℃ separately to reduce viscosity for easy to pour.For ease of disassembly next time,the cone and lining plate surface can precoat proper engine oil or mold release agent.
2 Configure adhesive:    Make the blender fix on low speed electric hand drill,Open the A component of BD65,stir it for 1 minute,then pour the B component into the A component drum at the same time stir it with the electric blender,it’s OK for color uniform,general stirring time is not more than 4 minutes.
Operation time:The total time from start mixing to finish filling is not more than 15 minutes(the data for 20℃)
Pouring:   Make the mixed-up BD65 adhesive solution pour into it along the cone or a place of lining plate crack,easy to exhaust,in necessity,can make a cofferdam guide with plasticine etc,until overflow from the top of crack.Don’t pour into the adhesive without mixing uniformly(with different colors)
4 Curing:   Place to cure for 12-24 hours,the temperature makes a big difference for the curing time,the curing speed is fast for high temperature,it can put into using to cure for 12 hours in summer,and cure for 24 hours in winter.

Our BD65 crusher special backing adhesive from web link: crusher special backing adhesives

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s